For most of the year, Bloomington's busiest Saturday morning happens downtown at Showers Common. The Bloomington Community Farmers' Market runs there every Saturday from April through October. On the first Saturday of November it moves south to the Switchyard Park Pavilion at 1601 S. Rogers St. The market is the last event to make that move. Food trucks, live music, a dog walk at night and a Sunday afternoon at the Pavilion all come first. Across Rogers Street, the city is also building a trail that will connect the park to the west side.
If you live in Hyde Park or elsewhere on the south side, the city's fall calendar now comes to you instead of downtown. The dates below show how much is happening between now and Thanksgiving.
Five Fridays and Two Sundays Left in October
The Switchyard Park lawn and Pavilion already hosted La Fiesta del Otoño on Sept. 19, with music, dance, food vendors and activities. Here is what is left on the October calendar:
- Every Friday through Oct. 30, 11 a.m. to 9 p.m. Food Truck Friday runs on Oct. 2, 9, 16, 23 and 30, with food trucks and live music. Visit Bloomington lists the season as April 10 through Oct. 30, 2026.
- Sunday, Oct. 4, 1 to 3 p.m. The free Buddy Walk takes place at Switchyard Park.
- Friday, Oct. 9, 7:30 to 8:30 p.m. Howl at the Moon is a free evening dog walk. Participants meet at the park's south-end basketball courts and follow a 1.5-mile paved route.
- Sunday, Oct. 11, 1 to 4 p.m. An Afternoon in the Park fills the Switchyard Pavilion with the Justin Case Band, games, face painting, food trucks, a silent auction and a raffle. Admission is free.
Oct. 9 is the evening to plan around. Food Truck Friday runs until 9 p.m. that night, and Howl at the Moon begins at 7:30, so dinner from a truck and a walk with the dog fit into the same visit. Use the south end of the park as your meeting point. The dog walk starts at the basketball courts there, which matters if you usually come in from a different entrance.
The Oct. 30 Food Truck Friday is the last one of the season. After that, the park has a quiet week before the farmers' market brings the Pavilion back to life.
November, When the Market Comes South
The City puts it simply. The market "takes place rain or shine every Saturday, April through October" at Showers Common, and then "takes place rain or shine in November" at the Switchyard Park Pavilion. The City's community events calendar lists three November dates.
| Market season | Location | Saturday hours |
|---|---|---|
| April through September | Showers Common, 401 N. Morton St. | 8 a.m. to 12:30 p.m. |
| October | Showers Common, 401 N. Morton St. | 9 a.m. to 12:30 p.m. |
| November 7, 14 and 21 | Switchyard Park Pavilion, 1601 S. Rogers St. | 9 a.m. to 12:30 p.m. |
Two details in that schedule are easy to miss. The October start time already moved an hour later, from 8 to 9 a.m., and that later start took effect at the beginning of this month. The November hours stay the same, so the main change is where you go, and for anyone south of downtown that trip is shorter.
The City describes the market's offerings as fruits and vegetables, eggs, meats and cheeses, honey, seasonal flowers, plants, and food and drink from local artisans. The market runs rain or shine, and November weather is unpredictable, so the Pavilion's roof makes a difference.
The Trail Being Built Across the Street
While the park's events wind down for the year, construction continues just west of Rogers Street. The Powerline Trail is a 0.9-mile, 12-foot-wide asphalt trail that starts at a trailhead west of Rogers Street, directly across from the Switchyard Park entrance. From there it runs west along the Duke Energy utility easement toward RCA Community Park and the Osage Place neighborhood.
The project has been planned for a long time. The City says an east-west trail connector along this route has been part of its plans since 1997. AZTEC Engineering Group was hired to design it in July 2020, and preliminary routes were shown at a public meeting in September 2024. On March 23, 2026, the Board of Park Commissioners awarded the $637,775 construction contract to Monroe LLC.
The design suits fall well. Easement rules mean the trail will have no lights, signs or benches outside the trailhead area. To make up for the missing lights, the asphalt includes glow-in-the-dark aggregate that charges in sunlight and glows after dark, so the trail can be used safely at night without power.
Here is the status as of the City's July 16, 2026 update:
- The new accessible pedestrian crossing on Rogers Street between the trailhead and the Switchyard Park entrance was finished and striped.
- A solar-powered, pedestrian-activated crossing signal and nearby curb work were still to come.
- Concrete curbs marked out the eastern trailhead, which will have bicycle parking, benches and landscaping.
- Crews were preparing the western end of the trail for asphalt.
At that time, Parks and Recreation staff said the project was on track for substantial completion by the end of 2026. We could not find a later public update or an opening date. Treat the trail as still under construction until the City announces otherwise, and don't assume the crossing signal on Rogers Street is working yet.
The trail ends at RCA Community Park, 1400 W RCA Park Dr. The park has six pickleball courts, two tennis courts, two basketball courts, a playground, an open field, paved and natural-surface trails, a Story Walk, shade sails and picnic tables. It also has a seasonal restroom west of the playground and two reservable shelters. The larger shelter has 10 tables and a crock-pot station, and the smaller one has a grill. When the trail opens, the south side's biggest event park and that collection of courts will be linked by a continuous paved path.
A Bakery Stop on the Way
Pan Nito Bakery recently opened at 339 Winslow Road in Winslow Plaza, a short drive from Rogers Street. It sells Mexican breads and pastries. In an Aug. 18 Herald-Times report, owner Carlos Aca said he planned pumpkin conchas and pan de muerto for the fall, and drinks and coffee were also planned.
Pan de muerto is traditionally baked for Día de los Muertos, on Nov. 1 and 2, so the bakery's fall menu peaks right as the market moves south. Picking up a pastry on Winslow Road on the way to the Pavilion is an easy addition to a November Saturday. Those menu plans were reported in August, so check with the bakery for current hours and what's on the shelves before you go.
Before You Head Over
A few details can save you a wasted trip:
- Parking and entrances. Howl at the Moon starts at the south-end basketball courts, and the farmers' market and An Afternoon in the Park both use the Pavilion. Know which part of the park you need before you park.
- Market timing. The City's community events calendar lists only three November market dates, Nov. 7, 14 and 21. The City's farmers' market page was updated Oct. 1 and is the place to check for any changes.
- Trail access. Until the City announces the Powerline Trail is open, the trailhead across from Switchyard Park is still a construction zone.
- Food Truck Friday's last night. It's Oct. 30, so the five Fridays from Oct. 2 through Oct. 30 are your remaining chances this year.
For the next eight weeks, the Switchyard Park Pavilion has something scheduled almost every weekend: food trucks on Fridays through Oct. 30, two free Sunday events in early October, and the farmers' market on Nov. 7, 14 and 21.
At Realty Professionals, we keep track of what's changing on Bloomington's south side, from the Powerline Trail's progress to the market's November move, because these details shape what it's like to live near Rogers Street. If you're wondering what your south-side home is worth as these projects take shape, start with our instant home valuation, and we'll help you understand the details.